What happens if I have manually adjusted a load list, and then change the component allocation QTY for a product?
This is what happens.
- You have manually adjusted a load list. How to do this.
- You have then changed the components allocated to a product. How to do this.
- The load list will recalculate based on the new component allocation.
- The original load list adjustment will remain, and adjust the load list via the original (plus/minus) adjustment.
Comments
0 comments
Please sign in to leave a comment.